In this article
  1. Two contracts, one plan
  2. The stages
  3. What to check before you sign the build contract
  4. A typical progress payment schedule
  5. How each payment is released
  6. Variations and cost overruns
  7. Frequently asked questions

Key takeaways

  • Funds are released in stages as the build progresses.
  • Interest is charged only on the amount drawn.
  • Have the payment schedule checked before you sign the contract.

Two contracts, one plan

With a house-and-land package you usually sign a land contract and a separate building contract. The land often settles first, sometimes months before construction starts, so you may begin repayments on the land loan early.

The stages

Builders invoice at set stages: deposit, slab, frame, lock-up, fixing and completion. Each time, the lender checks the work and pays the builder directly. Your interest is calculated only on the amount drawn so far.

What to check before you sign the build contract

Lenders have rules about how much can be paid at each stage and whether the price is fixed. A broker should review the payment schedule before you sign, not after.

Budget separately for driveways, fencing, landscaping and window coverings, which are often not included.

Rebuilding instead? See knock-down rebuilds and granny flats.

A typical progress payment schedule

StageWhat's completeTypical share of contract
DepositContract signedOften 5% (NSW caps deposits at 10%)
Base / slabFoundations and slab pouredAround 15–20%
FrameFrame up and inspectedAround 15–20%
Lock-upExternal walls, windows and doorsAround 25–35%
FixingInternal linings, cabinets, fixturesAround 15–20%
CompletionOccupation certificate issuedBalance

Percentages are indicative. NSW home building contracts set the actual schedule, and deposits on residential building work are capped by law. Your conveyancer or solicitor can review the contract.

How each payment is released

  1. The builder issues an invoice for the completed stage.
  2. You sign an authority to pay.
  3. The lender may send a valuer to check the progress.
  4. The lender pays the builder directly, and your interest increases on the new drawn balance.

Variations and cost overruns

Changes during the build, called variations, add cost. The lender usually wants any extra paid from your own funds first, or an approved increase to the loan. Keep a contingency of 5–10% if you can, and talk to us early if costs change.

Buying a package in the north-west? Read our house-and-land guide for Marsden Park, Schofields and Box Hill.

Questions? Talk them through with Ram

Free, no-obligation chat with Ram Lakshmanan. No credit check to start.

Frequently asked questions

No. Interest is charged only on funds drawn so far, so repayments rise as each stage is paid.

Yes, for larger projects. Smaller granny flats are often funded through equity release instead.

This article is general information only and doesn't consider your objectives, financial situation or needs. Scheme rules, thresholds and lender policies change; figures are current as at the date above. Read our disclaimer and Credit Guide.

Ram Lakshmanan

Written by

Ram Lakshmanan

Founder & Mortgage Broker, Lend Secure. 25+ years across financial services, business management and customer service. Credit Representative 580706.

More about Ram

Talk it through with Ram

A free, no-obligation conversation about where you are now and what you're planning. No credit check, no pressure.

Call Ram WhatsAppEnquireFree chat